Article R4532-6
In order to ensure that the coordinator has the authority and resources needed to carry out his duties properly, the project owner shall, from the preliminary design stage, provide for cooperation bet…
20+ full codes, 2,400+ articles translated and updated. Case law linked to every article. Read the actual text before you ask a lawyer about it — free, no login required.
20+
french codes
Fully translated
2,400+
articles in English
Updated regularly
480+
court rulings linked
Per article
Free
full access
No login required
Showing 2201–2210 of 37768 articles for “Art. Loi 89-462 du 6-7-1989”
In order to ensure that the coordinator has the authority and resources needed to carry out his duties properly, the project owner shall, from the preliminary design stage, provide for cooperation bet…
A contractor who has all or part of the contract entered into with the project owner performed by one or more subcontractors must provide the subcontractors with: 1° A copy of the general coordination…
…r, the subcontractor has at least thirty days to draw up the specific safety plan. This period is reduced to eight days for finishing work in the case of a building operation or for ancillary work pac…
For the host company, the safety protocol includes, in particular, the following information: 1° Safety instructions, particularly those relating to the loading or unloading operation; 2° The place of…
Where rescue and evacuation arrangements are covered by the general coordination plan, the specific safety plan may refer to the general coordination plan.
The specific safety plan is adapted to the specific conditions of work on the site. To this end, in addition to taking account of the general coordination measures decided by the coordinator and listi…
…sks associated with the operating methods, equipment, devices and installations used, the use of products, worker movements and the organisation of the site; 3° Indicates the collective or, failing th…
Openings in shafts, galleries with an incline of more than 45°, and openings such as those provided for the passage of lifts, or such as chimney shafts or trap doors, which may exist in the floors of…
…or near the installation, which is the overriding criterion; 2° The number of employees working or due to work, expressed as an average number of men per day present in or near the installation over…
The specific safety plan may be consulted for advice by the works doctor and members of the social and economic committees before any work is carried out on the site.
Avocate au Barreau de Paris
Toque #C2396
15+ Years In French Corporate Practice
English · French · Russian
Ready When You Are
A 20–30 minute call, in English, to scope the engagement. No obligation, no preliminary fee. You will leave the call with a clear view of what the work will cover and what it will cost.
20+ full codes and 2,400+ articles in English, with the key court rulings linked to every article — free to read.
Read MoreA lawyer-reviewed report explaining how the relevant articles apply to your situation, with case-law analysis and next steps.
Read MoreScope your matter with a Paris-Bar avocate — incorporation, contracts, disputes — handled bilingually, end to end.
Read More